San Diego Convention Center Expansion: Phase 3

The following document list has been compiled as a sampling of documents related to the site and proposed expansion project and is not intended to be a comprehensive list.

If you are interested in viewing a document not found below, please send a request notification to publicrecords@portofsandiego.org

Documents

Order by : Name | Date | Hits [ Descendent ]

Agenda Sheet for Board Meeting July 6, 2010 Agenda Sheet for Board Meeting July 6, 2010

Date added: 07/08/2010
Date modified: 05/27/2011
Filesize: 1.4 MB
Downloads: 1946

Amendment  to South Embarcadero Urban Design Guidelines - 2002 Amendment to South Embarcadero Urban Design Guidelines - 2002

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 3.77 MB
Downloads: 1989

The Amendment to the South Embarcadero Urban Design and Signage Guidelines was created to ensure coordinated development between the SERP area and the Ballpark District in the East Village area of Downtown San Diego. Specifically, the amendment addresses the Park Boulevard view corridor and provides for additional pedestrian amenities and consistent streetscape design for the “Bay-to-Park Link.”

Amendment No. 1 to Memorandum of Understanding between SDCCC and FAL Amendment No. 1 to Memorandum of Understanding between SDCCC and FAL

Date added: 07/01/2010
Date modified: 07/01/2010
Filesize: 891.27 kB
Downloads: 4470

Amendment No. 2 to Memorandum of Understanding between SDCCC and FAL Amendment No. 2 to Memorandum of Understanding between SDCCC and FAL

Date added: 07/01/2010
Date modified: 07/01/2010
Filesize: 931.64 kB
Downloads: 1879

Amendment No. 5 to the Fifth Avenue Landing, LLC Option Agreement Amendment No. 5 to the Fifth Avenue Landing, LLC Option Agreement

Date added: 07/07/2010
Date modified: 07/07/2010
Filesize: 501.68 kB
Downloads: 1852

Coastal Commission Staff Report for SERP 2 PMPA Coastal Commission Staff Report for SERP 2 PMPA

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 395.01 kB
Downloads: 1857

The California Coastal Commission staff report issued in November 2001 for the South Embarcadero Redevelopment Program 2 includes Coastal staff’s recommendations for the proposed Port Master Plan Amendment for the project.

Convention Center City Financing Authority Meeting 10_13_10 Convention Center City Financing Authority Meeting 10_13_10

Date added: 10/12/2010
Date modified: 10/12/2010
Filesize: 53.19 kB
Downloads: 1683

Convention Center Expansion Urban Design Master Plan-July 2010 Convention Center Expansion Urban Design Master Plan-July 2010

Date added: 07/09/2010
Date modified: 07/09/2010
Filesize: 6.28 MB
Downloads: 1855

Convention Center NOP Comments Convention Center NOP Comments

Date added: 01/20/2011
Date modified: 01/20/2011
Filesize: 5.37 MB
Downloads: 1258

Convention Center NOP Comments ALL Convention Center NOP Comments ALL

Date added: 04/20/2011
Date modified: 04/20/2011
Filesize: 5.37 MB
Downloads: 2465

Convention_Center_Exhibit_061810A Convention_Center_Exhibit_061810A

Date added: 06/24/2010
Date modified: 06/24/2010
Filesize: 4.62 MB
Downloads: 2793

Design Team RFQ SDCCC Design Team RFQ SDCCC

Date added: 07/26/2010
Date modified: 07/26/2010
Filesize: 403.49 kB
Downloads: 2062

Fentress - Nov. 9 2010 Expansion Press Conference Presentation Fentress - Nov. 9 2010 Expansion Press Conference Presentation

Date added: 11/09/2010
Date modified: 11/09/2010
Filesize: 42.89 MB
Downloads: 1359

PowerPoint presentation shown at November 9, 2010, media briefing related to the San Diego Convention Center Expansion: Phase 3.

Fifth Avenue Landing CDP for WTC Fifth Avenue Landing CDP for WTC

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 4.58 MB
Downloads: 3446

The Coastal Development Permit for the Fifth Avenue Landing Water Transportation Center was issued by the Board of Port Commissioners on April 7, 2007. The permit describes the approved development and lists required conditions. Project features include: demolition of existing structures; construction on a 1-acre public park and 15-foot wide promenade connecting to the Hilton site improvements; ticket booth; restroom facilities; 25 parking spaces; and, landscaping and signage.

Fifth Avenue Landing Water Transportation Lease Fifth Avenue Landing Water Transportation Lease

Date added: 07/01/2010
Date modified: 07/01/2010
Filesize: 15.37 MB
Downloads: 2352

Findings for SD Convention Center Expansion - Nov. 1995 Findings for SD Convention Center Expansion - Nov. 1995

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 36.51 MB
Downloads: 2839

The Findings of Fact for the San Diego Convention Center Expansion Project were adopted by the Board of Port Commissioners on November 21, 1995 with the certification of the Environmental Impact Report (EIR) for the project. The expansion project allowed for an additional 800,000 sf of functional space on a 14.7-acre site adjacent to the convention center constructed in 1984. The project also included an amendment to the Port Master Plan to provide for the expansion project.

Hilton Coastal Development Permit - Jan 2005 Hilton Coastal Development Permit - Jan 2005

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 3.71 MB
Downloads: 2141

The Coastal Development Permit for the Hilton San Diego Convention Center Hotel, issued by the Board of Port Commissioners on November 30, 2004, describes the approved development and lists the required conditions of the permit. Features of the Hilton hotel project include: 1,000 to 1,200 rooms in a maximum 500-foot high hotel tower, along with restaurant, retail and other amenities; meeting and ballroom space; public art; and, a 4.3-acre waterfront public park/plaza and promenade. Attachment A to the permit also describes the project’s conformance with the certified Port Master Plan.

Memorandum of Understanding between SDUPD, SDCC and FAL Memorandum of Understanding between SDUPD, SDCC and FAL

Date added: 07/01/2010
Date modified: 07/08/2010
Filesize: 1.36 MB
Downloads: 4243

Notice of Preparation for SDCC Phase III Expansion, Hotel & Port Master Plan Amendment EIR Notice of Preparation for SDCC Phase III Expansion, Hotel & Port Master Plan Amendment EIR

Date added: 12/01/2010
Date modified: 01/20/2011
Filesize: 966.45 kB
Downloads: 2582

Ordinance Fifth Avenue Landing lease for Water Transportation Center Ordinance Fifth Avenue Landing lease for Water Transportation Center

Date added: 07/07/2010
Date modified: 07/07/2010
Filesize: 5.39 MB
Downloads: 2064

Port Master Plan and Precise Plan, PD 3 Port Master Plan and Precise Plan, PD 3

Date added: 06/22/2010
Date modified: 07/13/2010
Filesize: 2.38 MB
Downloads: 1980

The purpose of the Port Master Plan (PMP) is to provide the planning policies for the physical development of the tidelands granted in trust to the San Diego Unified Port District. Port tidelands have been divided into planning districts. The San Diego Convention Center is located within Planning District 3, Center City Embarcadero. As described in the Precise Plan for Planning District 3, the basic concept of the redevelopment of the Embarcadero is to create a unified waterfront, both visually and physically, which creates an overall sense of place.

Presentation: San Diego Convention Center Phase 3 Expansion Project, Presentation: San Diego Convention Center Phase 3 Expansion Project,

Date added: 07/06/2010
Date modified: 07/06/2010
Filesize: 4.38 MB
Downloads: 3361

Proposed Hotel & Phase 3 Expansion of SDCCC (april 2010) Proposed Hotel & Phase 3 Expansion of SDCCC (april 2010)

Date added: 07/07/2010
Date modified: 07/07/2010
Filesize: 419.5 kB
Downloads: 2483

Resolution for Assignment for FAL Lease to SDCCC Resolution for Assignment for FAL Lease to SDCCC

Date added: 07/01/2010
Date modified: 07/01/2010
Filesize: 239.67 kB
Downloads: 4151

Resolution Lease Encumbrance SDCCC Resolution Lease Encumbrance SDCCC

Date added: 07/01/2010
Date modified: 07/01/2010
Filesize: 310.5 kB
Downloads: 1800

SD Convention Center Draft EIR - May 1984 SD Convention Center Draft EIR - May 1984

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 15.11 MB
Downloads: 1547

SD Convention Center Expansion Draft EIR - March 1995 SD Convention Center Expansion Draft EIR - March 1995

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 41.32 MB
Downloads: 3888

SD Convention Center Expansion Final EIR - Nov. 1995 SD Convention Center Expansion Final EIR - Nov. 1995

Date added: 06/22/2010
Date modified: 07/06/2010
Filesize: 47.26 MB
Downloads: 1726

The EIR for the San Diego Convention Center Expansion and PMPA provides a review and analysis of the environmental impacts that could result from the implementation of the Convention Center Expansion project. Appropriate mitigation measures are recommended for significant impacts.

SD Convention Center Expansion Parking Management & Monitoring Program - 1995 SD Convention Center Expansion Parking Management & Monitoring Program - 1995

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 3.09 MB
Downloads: 1412

SD Convention Center Expansion PMPA Submittal & CCC Staff Report - 1996 SD Convention Center Expansion PMPA Submittal & CCC Staff Report - 1996

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 7.46 MB
Downloads: 1618

SD Convention Center Expansion Revised Draft EIR - June 1995 SD Convention Center Expansion Revised Draft EIR - June 1995

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 36.29 MB
Downloads: 4767

SD Convention Center FINAL EIR - August 1984 SD Convention Center FINAL EIR - August 1984

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 12.89 MB
Downloads: 1834

The 1984 San Diego Convention Center Final Environmental Impact Report (EIR) includes the analysis of project impacts and mitigation included in the Draft EIR, as well as the comments submitted and the Port’s responses to those comments. The Project included the construction and operation of: up to 350,000 sf of exhibition space; 100,000 sf of meeting rooms; 267,000 sf of support and circulation space; 2,000 parking spaces; vehicular and pedestrian, and truck loading circulation elements; and, the option site hotel (now referred to as the Marriott) with up to 1,200 rooms, an additional 80,000 sf of meeting and restaurant space, 20,000 sf of specialty retail, and 1,400 parking spaces.

SD Convention Center PMPA Submittal and CCC Staff Report - 1984 SD Convention Center PMPA Submittal and CCC Staff Report - 1984

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 895.43 kB
Downloads: 1388

SDCC Phase III Expansion Public Outreach re: Public Realm Spaces (July 2011) SDCC Phase III Expansion Public Outreach re: Public Realm Spaces (July 2011)

Date added: 07/22/2011
Date modified: 07/22/2011
Filesize: 42.99 MB
Downloads: 823

SDCC Phase III Expansion Public Outreach re: Public Realm Spaces (July 2011) SDCC Phase III Expansion Public Outreach re: Public Realm Spaces (July 2011)

Date added: 07/22/2011
Date modified: 07/22/2011
Filesize: 60.66 MB
Downloads: 818

SDCCC Amended, Restated & Combined Lease SDCCC Amended, Restated & Combined Lease

Date added: 07/01/2010
Date modified: 07/01/2010
Filesize: 15.35 MB
Downloads: 2658

SERP 1 CCC Staff Report - Sept. 1998 SERP 1 CCC Staff Report - Sept. 1998

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 1.71 MB
Downloads: 1434

SERP 1 Draft EIR - Nov. 1997 SERP 1 Draft EIR - Nov. 1997

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 84.35 MB
Downloads: 2015

SERP 1 EIR Resolution 98-135 May 1998 SERP 1 EIR Resolution 98-135 May 1998

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 17.74 MB
Downloads: 1366

SERP 1 Final EIR, Findings and MMRP - March 1998 SERP 1 Final EIR, Findings and MMRP - March 1998

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 90.5 MB
Downloads: 6023

SERP 2 BPC EIR Agenda Sheet - April 17, 2001 SERP 2 BPC EIR Agenda Sheet - April 17, 2001

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 1.63 MB
Downloads: 1451

SERP 2 CCC Revised Findings - May 2002 SERP 2 CCC Revised Findings - May 2002

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 3.92 MB
Downloads: 2046

SERP 2 Draft EIR (volumes 1-3) Dec 2000 SERP 2 Draft EIR (volumes 1-3) Dec 2000

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 67.46 MB
Downloads: 3981

The South Embarcadero Redevelopment Program (SERP) 2 Draft Environmental Impact Report (EIR) analyzes potential impacts from the proposed changes to land use designations included in the associated Port Master Plan Amendment (PMPA) and implementation of the redevelopment program. The analysis includes mitigation measures to address significant impacts. The SERP 2 included the redevelopment of two lease hold areas: the development of a Convention Center Hotel on the former Campbell Industries Shipyard and a hotel on the Fifth Avenue Landing.

SERP 2 EIR Addendum No. 1 - April 2004 SERP 2 EIR Addendum No. 1 - April 2004

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 180.7 kB
Downloads: 2129

SERP 2 EIR Addendum No. 2 - Nov 2004 SERP 2 EIR Addendum No. 2 - Nov 2004

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 237.74 kB
Downloads: 1456

SERP 2 EIR Addendum No. 3 - July 2007 SERP 2 EIR Addendum No. 3 - July 2007

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 217.09 kB
Downloads: 1428

SERP 2 EIR Resolution 2001-71 SERP 2 EIR Resolution 2001-71

Date added: 06/22/2010
Date modified: 06/24/2010
Filesize: 263.79 kB
Downloads: 1393

SERP 2 Final EIR - March 2001 SERP 2 Final EIR - March 2001

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 46.51 MB
Downloads: 2507

The South Embarcadero Redevelopment Program (SERP) 2 Final Environmental Impact Report (EIR) contains the agency and public comments received on the SERP 2 Draft EIR and the Port’s responses to those comments.

SERP 2 Findings of Fact & MMRP - March 2001 SERP 2 Findings of Fact & MMRP - March 2001

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 4.95 MB
Downloads: 1640

The South Embarcadero Redevelopment Program (SERP) 2 Findings of Fact, Statement of Overriding Considerations, and Mitigation Monitoring and Reporting Program (MMRP) were adopted by the Board of Port Commissioners on April 17, 2001 with the certification of the SERP 2 EIR. The MMRP helps to ensure the effective implementation and assigns responsibility for the mitigation measures identified in the EIR.

SERP 2 Overview PowerPoint Presentation SERP 2 Overview PowerPoint Presentation

Date added: 06/22/2010
Date modified: 07/08/2010
Filesize: 29.96 MB
Downloads: 1234

This PowerPoint presentation provides an overview of the project features and public benefits of the South Embarcadero Redevelopment Program 2.

Page 1 of 2